Notice I said “finished”, not “done” as in baked in the oven. Actually, they could stand some heat. They are a little big. So I put them on and washed the dishes and gave them a good scrubbing. The cuffs are the right size so I had to be careful. Here they are pre-wash.


Can you see the difference in the thumbs? The left thumb (bottom) was knit with the main color in my left hand and the right with contrasting color in my right hand. Also, the left cuff is two rows shorter than the right. I’m glad they are finished. Now I can go back to my black socks. When they are finished, I’m starting on these.

Red Bird Kit

King of all he surveys